Burbank Water and Power Rate Selection Guide

Burbank Water and Power (BWP) is a community-owned municipal utility serving the City of Burbank, California with electric and water service. BWP has deployed AMI for both electric and water and exposes usage through its Oracle Opower-based Online Account Manager, but it does not yet offer Green Button, EDI, or a public API. California's AB 802 benchmarking program is the primary formal pathway for verified C&I building energy data.

California · Municipal Utility·Regulated market·Fully supported by Nectar·Last updated June 4, 2026

Burbank Water and Power Rate Schedule Comparison

ScheduleTypeRateBest For
Schedule C (Small GS)Commercial$20–$34/mo + TOU $0.1403–$0.4018/kWhSmall businesses without demand metering
Schedule D (Medium GS)Commercial$52–$69.50/mo + $16.10/kVA + TOU $0.1028–$0.2739/kWhMid-size facilities 20–250 kVA
Schedule L-TOU (Large GS)Commercial$425/mo + ~$12.05/kVA dist + $8.95/kVA reliability + TOU energyLarge facilities 250–1,000 kVA
Schedule XL-TOU (Extra Large GS)Industrial$750/mo + ~$11.50/kVA dist + $8.50/kVA reliability + TOU energyLarge industrial loads over 1,000 kVA
01

Market Overview

Burbank Water and Power is a publicly owned municipal utility. As a California POU it is not subject to CPUC retail competition or community choice aggregation; rates are set by the Burbank City Council via the annual Citywide Fee Schedule. There is no retail electricity supplier choice.

Market Type
Partially Deregulated
Supplier Choice
Not Available

Need to pull your actual usage data to compare rates? See the Burbank Water and Power Data Access Guide →


02

Current Rate Schedules

Commercial electric rates are set in the City of Burbank Citywide Fee Schedule (Article X). Phase 1 rates took effect January 1, 2026 (a ~9.9% system-average increase), with Phase 2 effective January 1, 2027. Commercial schedules are size-tiered by kVA and are demand-billed on kVA with summer/winter time-of-use energy charges, plus a per-kWh Energy Cost Adjustment Charge (ECAC) of $0.0340.

Effective: January 1, 2026 · Full Tariff Book →

ScheduleTypeApplicabilityStructureRate
Schedule C — Small General Service (no demand)commercialSmall commercial customers without demand metering.Customer charge (2026): $20.00/mo unmetered, $28.00 1-phase, $34.00 3-phase. TOU energy (2026): Summer On-Peak $0.4018, Mid-Peak $0.2623, Off-Peak $0.1403/kWh; Winter Mid-Peak $0.2623, Off-Peak $0.1403. ECAC $0.0340/kWh.
Schedule D — Medium General Service (20–250 kVA)commercialMedium commercial customers, 20 kVA to 250 kVA.Customer charge (2026): $52.00/mo 1-phase, $69.50 3-phase. Demand $16.10/kVA; minimum charge $134.71. TOU energy (2026): Summer On-Peak $0.2739, Mid-Peak $0.1713, Off-Peak $0.1028/kWh; Winter Mid-Peak $0.1713, Off-Peak $0.1028. ECAC $0.0340/kWh.
Schedule L-TOU Secondary — Large General Service (250–1,000 kVA)commercialLarge commercial secondary-voltage customers, over 250 kVA to 1,000 kVA.Customer charge (2026): $425.00/mo. Distribution demand $12.05/kVA (min $1,823.52); reliability demand $8.95/kVA (min $1,362.18). TOU energy (2026): Summer On-Peak $0.2179, Mid-Peak $0.1360, Off-Peak $0.0920/kWh. ECAC $0.0340/kWh.
Schedule L-TOU Primary — Large General Service (250–1,000 kVA)commercialLarge commercial primary-voltage customers, over 250 kVA to 1,000 kVA.Customer charge (2026): $425.00/mo. Distribution demand $11.20/kVA (min $1,701.80); reliability demand $8.35/kVA (min $1,216.61). TOU energy (2026): Summer On-Peak $0.2144, Mid-Peak $0.1337, Off-Peak $0.0902/kWh. ECAC $0.0340/kWh.
Schedule XL-TOU Secondary — Extra Large General Service (over 1,000 kVA)industrialExtra-large commercial secondary-voltage customers, over 1,000 kVA.Customer charge (2026): $750.00/mo. Distribution demand $11.50/kVA (min $7,965.61); reliability demand $8.50/kVA (min $5,913.76). TOU energy (2026): Summer On-Peak $0.2131, Mid-Peak $0.1328, Off-Peak $0.0896/kWh. ECAC $0.0340/kWh.
Schedule XL-TOU Primary — Extra Large General Service (over 1,000 kVA)industrialExtra-large commercial primary-voltage customers, over 1,000 kVA.Customer charge (2026): $750.00/mo. Distribution demand $10.70/kVA (min $7,390.32); reliability demand $7.88/kVA (min $5,502.52). TOU energy (2026): Summer On-Peak $0.2095, Mid-Peak $0.1304, Off-Peak $0.0878/kWh. ECAC $0.0340/kWh.

03

Rate Recommendations by Use Case

🏢

Mid-size commercial facility (20–250 kVA)

Schedule D customers should focus on kVA demand and summer on-peak energy. Power-factor correction and load shifting yield the biggest wins.

Recommended:
Schedule D — Medium General Service

Demand at $16.10/kVA plus summer on-peak energy at $0.2739/kWh dominate the bill; the $134.71 minimum applies to low-demand months.

Tips:
  • Correct power factor to reduce billed kVA
  • Shift load out of summer on-peak (4–7pm weekdays)
  • Track demand to avoid the minimum-charge floor
Est. monthly: $52–$69.50 + $16.10/kVA + TOU energy + ECAC
🏭

Large facility (250–1,000 kVA)

Schedule L customers carry separate distribution and reliability demand charges. Pursue primary service and aggressive demand management.

Recommended:
Schedule L-TOU Primary — Large General ServiceSchedule L-TOU Secondary — Large General Service

Two demand components (~$12.05 + $8.95/kVA secondary) plus a $425/mo customer charge make demand control critical; primary service lowers both demand rates.

Tips:
  • Evaluate primary-service eligibility for lower $/kVA
  • Flatten the load profile to cut peak kVA
  • Watch the distribution/reliability minimum charges
Est. monthly: $425/mo + ~$21/kVA combined demand + TOU energy + ECAC

Extra-large / industrial load (over 1,000 kVA)

Schedule XL customers should optimize across both demand components and TOU energy, and benchmark via AB 802.

Recommended:
Schedule XL-TOU Primary — Extra Large General ServiceSchedule XL-TOU Secondary — Extra Large General Service

$750/mo customer charge plus large demand minimums ($7,965/$5,913 secondary) reward high, flat load factors and primary service.

Tips:
  • Take primary service to reduce $/kVA
  • Maintain high load factor against the demand minimums
  • Use AB 802 + Portfolio Manager to target efficiency
Est. monthly: $750/mo + ~$20/kVA combined demand + TOU energy + ECAC
📊

C&I data access for benchmarking

Use AB 802 for verified building energy data; supplement with the OAM and the Opower integration for ongoing monitoring.

Recommended:

No Green Button, EDI, or public API exists; AB 802 is the formal verified pathway and Opower covers automated usage pulls.

Tips:
  • File AB 802 requests to conservation@burbankwaterandpower.com (subject: Benchmarking)
  • Use the Home Assistant Opower integration for automated usage
  • Use Nectar (docs.nectarclimate.com) for aggregator-based retrieval
Est. monthly: AB 802 data provided at no per-request charge; 10–20 business day turnaround

04

Historical Rate Trends

BWP rates are revised through the City of Burbank Citywide Fee Schedule. A multi-year increase was adopted with Phase 1 effective January 1, 2026 and Phase 2 effective January 1, 2027, raising both fixed customer charges and energy rates.

January 1, 2026

Phase 1 of the approved multi-year increase: electric system average rate increase of approximately 9.9%, with large commercial customer charges rising from ~$131 to $425/mo.

+9.9%

January 1, 2027

Phase 2 of the approved multi-year increase, further raising customer charges and energy rates across commercial schedules.

Phase 2

Overall trend: Rising — a multi-year, two-phase increase to address power supply and infrastructure costs.

Next expected change: Phase 2 increase effective January 1, 2027.


05

Cost Optimization Strategies

Because BWP commercial bills are dominated by kVA demand and time-of-use energy, the main savings levers are demand management, power-factor improvement (kVA vs kW), TOU load shifting, and taking primary service where eligible.

Shift load off summer on-peak

For: All TOU commercial schedules

Large per-kWh delta between on-peak and off-peak

Move discretionary load out of summer (Jun–Oct) on-peak hours, where energy is $0.21–$0.40/kWh versus far cheaper off-peak.

Improve power factor (kVA billing)

For: Medium / Large / Extra-Large

Lower kVA demand charges ($12–$16/kVA range)

Demand is billed on kVA, so correcting power factor directly reduces billed demand on Schedules D, L, and XL.

Take primary service where eligible

For: Large / Extra-Large customers owning primary equipment

Lower $/kVA on both demand components

Primary-voltage variants of Schedules L and XL carry lower distribution and reliability demand rates than secondary.

Use AB 802 data to target efficiency

For: C&I building owners (>50,000 sq ft)

Identifies the highest-ROI efficiency measures

Pull verified whole-building monthly data via AB 802 and benchmark in ENERGY STAR Portfolio Manager to prioritize efficiency projects.

To implement these strategies, you need your 15-minute interval data. Learn how to download Burbank Water and Power interval data →


06

Frequently Asked Questions

Can a C&I customer get verified building energy data from BWP?

Yes — through California's AB 802 program. For covered buildings over 50,000 sq ft, BWP provides aggregated whole-building monthly data (no tenant consent needed) or tenant-level data with signed Data Release Forms, returned as CSV/Excel within 10–20 business days to conservation@burbankwaterandpower.com.

Does BWP support Green Button or a public data API?

No. BWP runs on Oracle Opower (which supports Green Button Connect), but it has not activated Download or Connect My Data, and there is no public REST/GraphQL API or developer portal.

How can a consultant pull interval usage automatically?

BWP has no official interval export. The open-source Opower integration (Home Assistant / Tronikos opower library) can retrieve historical and forecasted usage using the customer's BWP credentials, and Nectar provides API access to this utility's billing and usage data — see docs.nectarclimate.com. For audit-grade data, use AB 802.

What commercial electric rate will my facility be on?

BWP classifies commercial accounts by size: Schedule C (Small General Service, no demand), Schedule D (Medium, 20–250 kVA), Schedule L-TOU (Large, 250–1,000 kVA, secondary or primary), and Schedule XL-TOU (Extra Large, over 1,000 kVA). All but Schedule C are demand-billed on kVA with time-of-use energy rates.

Are BWP rates increasing?

Yes. The City Council approved a multi-year increase: an electric system average increase of about 9.9% effective January 1, 2026 (Phase 1), with a further Phase 2 increase effective January 1, 2027. Commercial customer charges rose sharply under the new schedule.

Automate Burbank Water and Power Rate Analysis with Nectar

Nectar continuously monitors your Burbank Water and Power rate options and alerts you when a better schedule is available. Save 10-30% on energy costs.

Nectar for Energy & Sustainability Teams

Managing utility costs for commercial or industrial buildings? Nectar offers a free rate analysis — we'll review your current rate schedules and identify where switching tariffs or shifting load can save 10-30%.

Get a Free Rate Analysis

Nectar for Energy Brokers & Consultants

Advising clients on rate optimization? Nectar works with energy consultants who need reliable interval data and automated rate comparison tools.

Partner with Us