Northern Virginia Electric Cooperative (NOVEC) Data Access Guide
Northern Virginia Electric Cooperative (NOVEC) is a member-owned electric distribution cooperative serving over 182,000 accounts across Northern Virginia. Data access is delivered primarily through the NISC SmartHub portal and mobile app, with AMI smart meters enabling near real-time and interval consumption data.
How to Get Your Northern Virginia Electric Cooperative (NOVEC) Data: All Access Methods
| Method | 1st Party | 3rd Party | Customer Types | Data Types | Latency | Format |
|---|---|---|---|---|---|---|
| SmartHub Portal & App | ✓ | — | Residential & C&I | Billing, usage trends, daily/hourly intervals | Near real-time | HTML, PDF |
| Green Button DMD (if enabled) | ✓ | — | All (unconfirmed) | Usage XML | On demand | ESPI XML |
| NISC SmartHub API (unofficial) | ✓ | ✓ | Developers with consent | 15-minute interval data | Near real-time | JSON, CSV |
| Manual data sharing | — | ✓ | Authorized consultants | Bills, Green Button XML | On demand | PDF, XML |
| Nectar API (third-party access) | — | ✓ | Vendors via Nectar | Billing, usage | See Nectar documentation | Nectar API |
Billing Data Access
NOVEC provides billing data through the NISC SmartHub web portal and MyNOVEC mobile app, including current bills, historical bills, payment status, and usage/cost trends. There is no standardized published third-party billing-access program.
What Data Is on Your Northern Virginia Electric Cooperative (NOVEC) Bill
- Current monthly bill and amount due
- Historical bills and payment status
- Cost comparisons across billing periods
- Usage trends and costs
- Account activity and recent payments
How to Download Northern Virginia Electric Cooperative (NOVEC) Bills (Business & Commercial)
- 01Register all business accounts in SmartHub
- 02Use multi-account management to view a consolidated dashboard across sites
- 03Download PDF bills and review usage/cost trends in Usage Explorer
- 04For third-party analysis, contact NOVEC at 703-335-0500 about authorization/multi-user access
- 05Share downloaded bills or Green Button data (where available) with consultants
How to Download Northern Virginia Electric Cooperative (NOVEC) Bills (Residential)
- 01Register at https://www.novec.com/Register-for-SmartHub.cfm using your NOVEC account number
- 02Log in at https://novec.smarthub.coop/
- 03Open the Billing / My Account section
- 04Select a billing period to view details and download the PDF bill
- 05Configure email or SMS notifications for bills and usage thresholds
Third-Party Access to Northern Virginia Electric Cooperative (NOVEC) Billing Data
Manual Authorization & Data Sharing
- 01Customer grants written authorization to the third party
- 02Customer downloads bills (PDF) or Green Button XML from SmartHub
- 03Customer shares the data file with the authorized third party
- 04Third party analyzes the data with their own tools
SmartHub Multi-User / Account Manager (if available)
- 01Customer logs into SmartHub
- 02Locate authorized-user / account-manager settings
- 03Add the third party's email and permissions
- 04Third party accepts the invitation and logs in to view authorized data
- 05Confirm availability with NOVEC at 703-335-0500
Want to understand the charges on your bill?
See the Northern Virginia Electric Cooperative (NOVEC) Rate Schedules & Tariff Guide →Interval Data & Smart Meters
NOVEC is deploying AMI smart meters capturing near real-time consumption. SmartHub Usage Explorer shows daily/hourly trends; third-party developers have documented 15-minute interval data via the underlying NISC SmartHub API. Full interval access through the official portal is still being expanded.
How to Download Northern Virginia Electric Cooperative (NOVEC) Interval Data via Green Button
- 01NISC SmartHub supports Green Button at other cooperatives, but NOVEC does not explicitly publish a Green Button implementation
- 02If available: log into SmartHub and open My Usage
- 03Look for a 'Download My Data' / Green Button option
- 04Select a reporting period (typically up to ~14 months)
- 05Download the ESPI XML file for use with third-party tools
- 06Confirm availability with NOVEC at 703-335-0500
Interval data is essential for rate comparison and TOU analysis.
See which Northern Virginia Electric Cooperative (NOVEC) rate schedule is best for your usage pattern →Third-Party API Access
NOVEC does not publish an official developer API or OAuth program. Third-party developers have reverse-engineered the NISC SmartHub internal API to retrieve 15-minute interval data using customer credentials; this is unofficial and subject to change.
Available Northern Virginia Electric Cooperative (NOVEC) API Endpoints
| Function | Endpoint | Method | Format |
|---|---|---|---|
| Poll utility usage (interval data) | services/secured/utility-usage/poll (NISC SmartHub internal) | GET | JSON |
How to Register as a Northern Virginia Electric Cooperative (NOVEC) API Vendor
- 01Obtain customer authorization
- 02Use the open-source electric-usage-downloader tool
- 03Configure SmartHub username, password, and service location number
- 04Run extraction to CSV or a time-series database
- 05Verify compliance with NOVEC/SmartHub terms of service
EDI (Electronic Data Interchange)
How to Enroll in Northern Virginia Electric Cooperative (NOVEC) EDI
- 01NOVEC does not publish formal EDI services for retail customer data exchange
- 02For inquiries, contact NOVEC at 703-335-0500 or customerservice@novec.com
- 03Specify required transactions, your AS2/VAN capabilities, and volume
- 04Ask about CSV-over-SFTP or API alternatives if EDI is unavailable
Sources
Rate Schedules & Tariff Analysis
NOVEC C&I bills combine a fixed monthly service charge, volumetric distribution, and a PCA-adjusted power-supply charge. Larger schedules (LP-1, HV-1, HV-2) add demand (kW) charges, so load factor and demand management drive cost. EIA-derived averages show commercial at about 6.88 cents/kWh and industrial at about 5.27 cents/kWh — among the lower rates in Virginia. Because NOVEC is a regulated cooperative with no retail choice, optimization focuses on rate-class fit, demand management, load management programs, and interruptible options rather than supplier shopping.
Northern Virginia Electric Cooperative (NOVEC) Rate Schedule List
| Schedule | Applicability |
|---|---|
| Small Commercial Service - SC-1 | Small commercial accounts |
| Large Power Service - LP-1 | Large C&I accounts with demand |
| Large Power Dedicated Distribution Service - HV-1 | Very large dedicated-distribution customers |
| Large Power Dedicated Facilities Contract Service - HV-2 | Largest dedicated-facilities-contract customers |
| Interruptible Service Rider - IS-1 | Large interruptible-service customers |
Northern Virginia Electric Cooperative (NOVEC) Rate Features & TOU Details
- Regulated cooperative rates set by the Virginia SCC — no retail supplier choice
- Power Cost Adjustment (PCA) passes through wholesale power cost
- Residential service charge rebalanced to $21.30 effective Jan 1, 2024 (revenue-neutral)
- Large schedules (LP-1/HV-1/HV-2) are demand-based; load factor matters
- Interruptible Service Rider (IS-1) and Load Management can reduce cost
- Verified averages: commercial ~6.88 cents/kWh, industrial ~5.27 cents/kWh (EIA-derived)
For a deeper analysis including cost optimization strategies and historical rate trends:
Read the full Northern Virginia Electric Cooperative (NOVEC) Rate Optimization Guide →Other Data Access Programs
Load Management Program
Voluntary water-heater and AC load-control program that reduces electricity costs and includes free repair/service; 54,000+ members enrolled.
- 01Review eligibility at the Load Management page
- 02Enroll with NOVEC and have a control switch installed
- 03Allow brief control events during peak periods
- 04Receive program bill benefits
Net Energy Metering (NEM)
Net metering for on-site solar generation, allowing members to offset usage with self-generated power under Schedule NEM.
- 01Review the NEM rider terms
- 02Apply for interconnection of on-site solar
- 03Install qualifying generation and meter
- 04Receive net-metering credits on the bill
Limitations & Considerations
- ⚠No competitive retail supplier choice — NOVEC is a regulated member-owned cooperative.
- ⚠No formal third-party data-access program (no official API, OAuth, or Green Button Connect My Data).
- ⚠Green Button Download My Data is supported by the NISC platform but not confirmed for NOVEC.
- ⚠No formal EDI services documented for retail customer data exchange.
- ⚠15-minute interval access relies on an unofficial reverse-engineered SmartHub API subject to change.
- ⚠Specific per-kWh and demand charges for each C&I schedule are published only in the individual tariff PDFs.
Northern Virginia Electric Cooperative (NOVEC) Data Access FAQ
Can NOVEC C&I customers choose their electricity supplier?▾
No. NOVEC is a member-owned, not-for-profit electric cooperative regulated by the Virginia State Corporation Commission. There is no competitive retail supplier choice; members receive bundled regulated service, with wholesale power cost passed through via the Power Cost Adjustment (PCA).
Which rate schedules apply to commercial and industrial accounts?▾
C&I accounts take service under Small Commercial (SC-1), Large Power (LP-1), Large Power Dedicated Distribution (HV-1), Large Power Dedicated Facilities Contract (HV-2, common for data centers), Cogeneration (GV), and the Interruptible Service Rider (IS-1). Demand (kW) charges apply on the larger schedules; exact charges are in each tariff PDF on NOVEC's Regulated Rates page.
How can a consultant access a NOVEC customer's usage data?▾
NOVEC has no formal automated third-party program. Options are: (1) the member downloads bills/Green Button XML from SmartHub and shares them; (2) SmartHub multi-user access if the member adds the consultant; (3) the unofficial NISC SmartHub API for 15-minute interval data with member consent; or (4) Nectar, which provides API access to billing and interval data after member authorization — see docs.nectarclimate.com. Contact NOVEC at 703-335-0500 for authorization options.
What interval data is available and at what granularity?▾
AMI meters capture near real-time usage. SmartHub's UI exposes daily and hourly views, while 15-minute interval kWh/cost data is accessible through the unofficial NISC SmartHub API. Roughly 12-24 months of interval history is typically available, with a possible 15-30 minute delay on recent reads.
How can large C&I accounts lower their NOVEC bill?▾
Because there is no supplier choice, focus on rate-class fit, demand/load-factor management on LP-1/HV schedules, the voluntary Load Management program, and the IS-1 interruptible rider. Use SmartHub or interval data to identify and shave peak demand.
The Best Way to Access Data from Northern Virginia Electric Cooperative (NOVEC)
Nectar connects to Northern Virginia Electric Cooperative (NOVEC) and 7,000+ utility providers — billing, interval, and rate data delivered automatically. No portals, no forms, no manual downloads.
Nectar for Energy & Sustainability Teams
Managing utility data for commercial or industrial buildings? Nectar offers a free energy data audit — we'll review your current setup and show you where automation can save your team hours every month.
Get a Free AuditNectar for Developers & Consultants
Building energy tools or advising clients on utility data? Nectar works with technology partners and consultants who need reliable data infrastructure.
Partner with Us