Flathead Electric Cooperative Data Access Guide

Flathead Electric Cooperative is Montana's largest electric cooperative, a member-owned utility serving roughly 76,000 meters across the Flathead Valley with low-cost, predominantly hydroelectric power from the Bonneville Power Administration. Member energy data is available through the NISC SmartHub portal, Green Button XML downloads, and a public 15-minute demand lookup tool.

Montana · Electric Cooperative·75,982 customers·Fully supported by Nectar·Last updated June 4, 2026

How to Get Your Flathead Electric Cooperative Data: All Access Methods

Method1st Party3rd PartyCustomer TypesData TypesLatencyFormat
SmartHub Online PortalAll members (residential and C&I)Billing, payments, usage graphsOn-demandPDF, Web
Green Button Download (DMD)All membersInterval usageOn-demand (up to 14 months)ESPI XML (zipped)
15-Minute Demand Lookup ToolAll members15-minute demandOn-demandWeb / download
My Co-op Mobile AppAll membersBilling, usageOn-demandApp display, PDF
01

Billing Data Access

Members access billing data through the NISC SmartHub web portal and the My Co-op mobile app. Both provide bill history, PDF downloads, usage graphs, and payment management using the same credentials. There is no documented automated third-party billing-data portal; representative access is arranged by contacting the co-op directly.

What Data Is on Your Flathead Electric Cooperative Bill

  • Current bill amount and due date
  • Itemized charges and rate details
  • Archived billing and payment history
  • Usage graphs and trend analysis

How to Download Flathead Electric Cooperative Bills (Business & Commercial)

  1. 01Log in to SmartHub (commercial and residential members share the same portal)
  2. 02Review billing and demand charges under Billing and Payments
  3. 03For bulk or commercial-specific exports, contact Energy Services at (406) 751-1834
  4. 04Request multi-account consolidation if managing several premises

How to Download Flathead Electric Cooperative Bills (Residential)

  1. 01Register at https://flatheadelectric.smarthub.coop/ui/#/registration with account number and email
  2. 02Log in to the SmartHub portal
  3. 03Open the Billing and Payments section
  4. 04View or download individual bill PDFs and payment history

Third-Party Access to Flathead Electric Cooperative Billing Data

Manual Representative Authorization

  1. 01Contact FEC Member Services at (406) 751-4483 or (800) 735-8489
  2. 02Provide signed customer authorization and account number
  3. 03Specify data requested and authorization period
  4. 04FEC configures account access per its internal policy
PDF (bill downloads)Web display / graphical usage charts

Want to understand the charges on your bill?

See the Flathead Electric Cooperative Rate Schedules & Tariff Guide →

02

Interval Data & Smart Meters

Flathead Electric has a fully deployed AMI/smart meter system (approximately 96% participation per BPA Pacific Northwest Smart Grid Demonstration Project documentation). Interval usage is available to members via Green Button XML download in SmartHub and through a public 15-minute demand lookup tool used for generator sizing and load analysis.

Meter Technology
Advanced Metering Infrastructure (AMI) smart meters, system-wide deployment (~96%).
Electric Granularity
15-minute or hourly intervals depending on SmartHub configuration; 15-minute demand available via the demand lookup tool.
Gas Granularity
Not applicable (electric-only utility).

How to Download Flathead Electric Cooperative Interval Data via Green Button

  1. 01Log in to https://flatheadelectric.smarthub.coop
  2. 02Open the My Usage or Usage Explorer tab
  3. 03Select Green Button Download My Data
  4. 04Choose a date range (up to 14 months)
  5. 05Download the zipped ESPI XML file and extract it

Interval data is essential for rate comparison and TOU analysis.

See which Flathead Electric Cooperative rate schedule is best for your usage pattern →

03

Green Button Access

Download My Data

Members can download approximately 14 months of interval usage data as zipped ESPI/Green Button XML, compliant with the NAESB REQ.21 ESPI standard, from the SmartHub Usage Explorer.

Formats
ESPI XML (zipped)
Available To
All members with SmartHub accounts

Connect My Data

Green Button Connect My Data (automated third-party API authorization) is not documented for Flathead Electric. Third parties must request data sharing directly from the co-op or have the member download and forward Green Button files.

API Standard
Not available
Available To
Not documented

04

Third-Party API Access

Flathead Electric does not publish a developer API or Green Button Connect My Data endpoint. Programmatic access for aggregators or consultants is handled case-by-case through the co-op's Energy Services and Member Services teams. The primary machine-readable export is the Green Button XML download.

Program
No public API program
Auth Method
Manual authorization (no OAuth program documented)
Rate Limits
Not documented
Interval Latency
Not documented

How to Register as a Flathead Electric Cooperative API Vendor

  1. 01Contact FEC Member or Business Services to describe the use case
  2. 02Confirm whether Green Button data sharing can be authorized
  3. 03Obtain signed member authorization
  4. 04Arrange a data-sharing method (portal access, scheduled export, or member-forwarded Green Button files)

05

EDI (Electronic Data Interchange)

How to Enroll in Flathead Electric Cooperative EDI

  1. 01No published EDI program; contact FEC to inquire about transaction-based data exchange or CSV alternatives

06

Rate Schedules & Tariff Analysis

Flathead's C&I rates are among the lowest in the nation, anchored by inexpensive BPA hydropower. As demand size increases, the structure shifts from flat energy pricing toward demand-based and seasonal time-of-day pricing, rewarding members who flatten peaks and shift load off peak. Primary-voltage members earn an additional bill discount.

Flathead Electric Cooperative Rate Schedule List

ScheduleApplicability
Large General Service (LGS01)100 kW to under 400 kW
Extra Large General Service (XGS01)400 kW to under 1,000 kW
Industrial Service (IND01)1,000 kW and greater

Flathead Electric Cooperative Rate Features & TOU Details

  • Demand-tiered class structure by kW
  • Seasonal time-of-day energy pricing for XGS and Industrial
  • Reactive power charge ($1.29/kVAR) on MGS and larger
  • Primary voltage delivery discount (-1.5% and -$0.15/kW)
  • 5.5% overall increase effective June 1, 2026

For a deeper analysis including cost optimization strategies and historical rate trends:

Read the full Flathead Electric Cooperative Rate Optimization Guide →

07

Other Data Access Programs

Commercial Energy Efficiency Rebates

FEC Energy Services offers rebates and energy-efficiency consultation for commercial members, including lighting, HVAC, and motor upgrades, plus backup generation sizing support.

  1. 01Contact Energy Services at (406) 751-1834
  2. 02Review eligible commercial measures
  3. 03Apply for the applicable rebate program

On-Bill Financing

Financing for qualifying energy-efficiency improvements repaid through the member's electric bill.

  1. 01Contact Energy Services
  2. 02Confirm eligible measures
  3. 03Enroll in on-bill repayment

08

Limitations & Considerations

  • No documented Green Button Connect My Data (automated third-party API) program.
  • No public developer API or developer portal.
  • No documented EDI / trading-partner program.
  • No dedicated Share My Data authorization portal; third-party access is manual and case-by-case.
  • Exact billing-history retention period is not published; confirm with FEC.

09

Flathead Electric Cooperative Data Access FAQ

How can a commercial member pull interval data for energy analysis?

Log in to SmartHub and use the Usage Explorer to download up to 14 months of Green Button (ESPI XML) interval data. For 15-minute demand specifically, use the public 15-Minute Demand Lookup Tool. For bulk or recurring exports, contact Energy Services at (406) 751-1834.

Does Flathead Electric support automated third-party data access (Green Button Connect or an API)?

No automated Green Button Connect My Data or public API is documented. Third parties such as energy managers or aggregators must arrange access directly with the co-op, typically via signed member authorization, or have the member download and forward Green Button files.

Which rate schedule applies to my business?

Schedules are sized by demand: Small General Service (under 50 kW), Medium General Service (50 to under 100 kW), Large General Service (100 to under 400 kW), Extra Large General Service (400 to under 1,000 kW), and Industrial Service (1,000 kW and above). Larger classes carry separate demand and load-size charges plus time-of-day energy pricing.

How do demand charges work for C&I members?

Medium and larger general-service classes bill a per-kW demand charge based on metered peak demand. Extra Large General Service and Industrial classes also use seasonal time-of-day energy rates (winter/summer on-, mid-, and off-peak), so shifting load off peak reduces both energy and demand costs.

Is there a discount for taking service at primary voltage?

Yes. Medium, Large, Extra Large General Service, and Industrial classes receive a Primary Voltage Delivery Discount of -1.5% of the total bill and -$0.15 per kW for members metered at primary voltage.

The Best Way to Access Data from Flathead Electric Cooperative

Nectar connects to Flathead Electric Cooperative and 7,000+ utility providers — billing, interval, and rate data delivered automatically. No portals, no forms, no manual downloads.

Nectar for Energy & Sustainability Teams

Managing utility data for commercial or industrial buildings? Nectar offers a free energy data audit — we'll review your current setup and show you where automation can save your team hours every month.

Get a Free Audit

Nectar for Developers & Consultants

Building energy tools or advising clients on utility data? Nectar works with technology partners and consultants who need reliable data infrastructure.

Partner with Us