Public Utility District No. 1 of Chelan County Data Access Guide

Chelan County PUD is a customer-owned public utility district serving roughly 51,000 electric customers in north-central Washington with some of the lowest hydroelectric rates in the United States. The utility has completed a near-total AMI smart meter rollout but offers limited programmatic data access (no Green Button, EDI, or third-party API). As public power, there is no retail energy choice.

Washington · Municipal Utility·51,000 customers·Fully supported by Nectar·Last updated June 4, 2026

How to Get Your Public Utility District No. 1 of Chelan County Data: All Access Methods

Method1st Party3rd PartyCustomer TypesData TypesLatencyFormat
PowerPay Online PortalResidential & CommercialBilling, payment history, account infoReal-time (billing)Web (HTML), PDF
Current Mobile AppResidential & CommercialBilling summary, outage alertsReal-timeMobile app
Manual Data RequestAll (third party requires authorization)Billing/usage historyDays (manual)PDF/email
Green Button / API / EDINoneNot supportedN/AN/A
01

Billing Data Access

Chelan PUD offers a self-service online billing portal called PowerPay providing 24/7 access to billing and payment information, supplemented by the 'Current' mobile app. Detailed interval consumption and bulk structured exports are not yet available; data beyond the portal must be requested manually from customer service.

What Data Is on Your Public Utility District No. 1 of Chelan County Bill

  • Current bill amount and recent billing history
  • Payment history
  • Account and service information
  • Individual bill PDFs
  • Outage alerts (via mobile app)

How to Download Public Utility District No. 1 of Chelan County Bills (Business & Commercial)

  1. 01Enroll in PowerPay with the business account number and ZIP code
  2. 02For data beyond the portal (multi-year history, interval data, CSV), email ContactUs@chelanpud.org or call (509) 663-8121
  3. 03For third-party access, supply signed customer authorization to Business Services

How to Download Public Utility District No. 1 of Chelan County Bills (Residential)

  1. 01Visit the PowerPay enrollment page
  2. 02Enter your 10-digit Chelan PUD account number
  3. 03Enter the 5-digit ZIP code on the account mailing address
  4. 04Create account credentials
  5. 05Log in 24/7 to view bills, payment history, and account info
Web portal (HTML)PDF (individual bills)

Want to understand the charges on your bill?

See the Public Utility District No. 1 of Chelan County Rate Schedules & Tariff Guide →

02

Interval Data & Smart Meters

Chelan PUD completed a full AMI deployment in February 2023 with approximately 98.5% of ~51,000 meters converted to two-way smart meters by end of 2024. However, customer-facing interval data tools are still 'in the works' and detailed interval/hourly consumption is not yet self-serviceable through PowerPay or the mobile app.

Meter Technology
Advanced Metering Infrastructure (AMI) — two-way encrypted wireless smart meters, ~98.5% deployed as of end of 2024.
Electric Granularity
Subdaily interval collection at the meter; specific granularity (15/30/60-minute) not published. Customer-facing access not yet available.
Gas Granularity
Not applicable (Chelan PUD does not provide retail gas service).

How to Download Public Utility District No. 1 of Chelan County Interval Data via Green Button

  1. 01Green Button is not supported. To request interval/usage data, email ContactUs@chelanpud.org or call (509) 663-8121
  2. 02Provide account number and the data range and granularity required
  3. 03Receive data manually (format and turnaround vary)

Interval data is essential for rate comparison and TOU analysis.

See which Public Utility District No. 1 of Chelan County rate schedule is best for your usage pattern →

03

Green Button Access

Download My Data

Chelan PUD does not support Green Button Download My Data. Bills can be downloaded individually as PDFs, but no standardized Green Button XML/CSV export exists.

Available To
Not available

Connect My Data

Chelan PUD does not support Green Button Connect My Data (NAESB REQ.21 ESPI). It is not listed in the Green Button Alliance directory, and no third-party authorization API exists.

API Standard
None
Available To
Not available

04

Third-Party API Access

Chelan PUD does not operate a Share My Data program, developer portal, or third-party data-sharing API. Energy consultants, aggregators, and energy managers must obtain signed written customer authorization and work with customer service for case-by-case manual data sharing. No automated, programmatic, or real-time feed exists.

Program
None (manual authorization only)
Auth Method
Manual written customer authorization (signed letter/form) submitted to customer service.
Rate Limits
Not applicable (no API).
Interval Latency
Not available programmatically.

How to Register as a Public Utility District No. 1 of Chelan County API Vendor

  1. 01Obtain signed customer authorization including customer name, account number, and scope of data requested
  2. 02Email ContactUs@chelanpud.org or call (509) 663-8121
  3. 03Coordinate with Chelan PUD staff for manual data delivery via email/mail/portal

05

EDI (Electronic Data Interchange)

How to Enroll in Public Utility District No. 1 of Chelan County EDI

  1. 01No EDI program exists. Organizations requiring B2B data interchange should contact Business Services at ContactUs@chelanpud.org or (509) 663-8121 to discuss custom arrangements.

06

Rate Schedules & Tariff Analysis

Chelan PUD's C&I rate design is unusually simple and inexpensive thanks to abundant low-cost hydroelectric generation. Larger primary-power schedules (3/30) carry a high fixed basic charge but very low energy charges (~$0.016/kWh), while general-service (Schedule 2) customers pay more per kWh but lower fixed charges. High-density and data-center loads (Schedules 35/36) face higher demand/energy charges plus upfront capital charges to cover incremental infrastructure.

Public Utility District No. 1 of Chelan County Rate Schedule List

ScheduleApplicability
Schedule 2 — General ServiceCommercial/small industrial; 0-39 kW and 40+ kW tiers.
Schedule 3 — Standard / Primary Power0.4-5 aMW primary-power loads.
Schedule 30 — Time of UseOptional TOU for 0.4-5 aMW loads.
Schedule 35 — High Density LoadEUI >=250 kWh/ft2/yr loads up to 3 MW.
Rate 36 — Data Centers & Similar LoadsData center/crypto computing loads up to 3 MW.

Public Utility District No. 1 of Chelan County Rate Features & TOU Details

  • Among the lowest C&I energy rates in the U.S. (~$0.016-$0.031/kWh)
  • Demand charges from $2.80/kW (Schedule 2) up to $6.40/kW (Schedules 35/36)
  • Dedicated high-density and data-center/crypto schedules with upfront capital charges
  • Optional time-of-use rate (Schedule 30) for large primary loads
  • 3% electric rate increases approved for June 2025 and June 2026

For a deeper analysis including cost optimization strategies and historical rate trends:

Read the full Public Utility District No. 1 of Chelan County Rate Optimization Guide →

07

Other Data Access Programs

Slice Power Sales Data (Wholesale)

A wholesale power-sales program providing real-time hydroelectric generation and transmission data to wholesale energy traders and market participants. Not available to retail customers.

  1. 01Engage Chelan PUD wholesale/business services
  2. 02Negotiate access to the proprietary wholesale portal and data files

Future Customer Data Tools (Roadmap)

Chelan PUD has stated that expanded customer energy-usage access, high-use alerts, faster multi-channel outage notifications, and time-of-use/demand-response foundations are planned for 2024-2026 but not yet broadly available.

  1. 01Monitor the AMI/learning-center pages for new tool releases
  2. 02Contact Business Services to inquire about timelines for interval data and programmatic access

08

Limitations & Considerations

  • No Green Button (Download or Connect My Data) support; not listed in the Green Button Alliance directory.
  • No public developer API or programmatic third-party data feed.
  • No EDI program (no 814/820/867 transaction support).
  • Customer-facing interval/hourly data not yet available despite ~98.5% AMI deployment.
  • Third-party access is manual only, requiring signed customer authorization with no SLA.
  • No bulk CSV/Excel export documented through PowerPay (individual PDF bills only).

09

Public Utility District No. 1 of Chelan County Data Access FAQ

Can a C&I customer or energy consultant get interval (15-minute) data from Chelan PUD?

Not yet via self-service. Although ~98.5% of meters are AMI smart meters, customer-facing interval data tools are still under development. C&I customers and authorized consultants must request usage data manually by emailing ContactUs@chelanpud.org or calling (509) 663-8121; format and turnaround vary.

Does Chelan PUD support Green Button, an API, or EDI for automated data access?

No. Chelan PUD does not support Green Button Download or Connect My Data, has no public developer API, and runs no EDI program. All data beyond the PowerPay portal is shared manually. Organizations needing programmatic access should establish a Business Services relationship and ask about future roadmap options.

How does a third party (aggregator/energy manager) get authorized to access a customer's data?

There is no automated authorization workflow. The third party must obtain a signed customer authorization letter or form (customer name, account number, scope of data), then submit it to Chelan PUD customer service. Staff provide billing/usage data on a case-by-case basis via email, mail, or portal access.

What commercial and industrial rate schedules does Chelan PUD offer?

Key C&I schedules are Schedule 2 General Service (commercial/small industrial, with separate 0-39 kW and 40+ kW demand tiers), Schedule 3 Standard/Primary Power Service and Schedule 30 Time-of-Use (loads of 0.4-5 aMW), Schedule 35 High Density Load (high energy-use-intensity loads up to 3 MW), and Rate 36 for data centers and similar loads (including cryptocurrency mining).

Are Chelan PUD rates really that low, and are they changing?

Yes. Backed by low-cost hydroelectric generation, Chelan's C&I energy charges (e.g., roughly $0.016/kWh on Schedule 3 as of mid-2024) are among the lowest in the U.S. In November 2024 commissioners approved a two-year rate-plan extension with 3% electric increases effective June 2025 and June 2026.

The Best Way to Access Data from Public Utility District No. 1 of Chelan County

Nectar connects to Public Utility District No. 1 of Chelan County and 7,000+ utility providers — billing, interval, and rate data delivered automatically. No portals, no forms, no manual downloads.

Nectar for Energy & Sustainability Teams

Managing utility data for commercial or industrial buildings? Nectar offers a free energy data audit — we'll review your current setup and show you where automation can save your team hours every month.

Get a Free Audit

Nectar for Developers & Consultants

Building energy tools or advising clients on utility data? Nectar works with technology partners and consultants who need reliable data infrastructure.

Partner with Us